Skip to content
Independent consulting · live Stripe for start & portal · leftover via AP / TD-290 · not Cal OES

Replacement timeline

From allotment letter through cutover

Cities and Advisors run on different clocks. Cycle Steward sits on the PSAP side so leftover, TD-284, and the 90-day pack do not collide.

  1. 01

    PSAP + Advisor

    Allotment

    PSC-299 and the current allotment letter. Ceiling for the complete system plus residual-list items.

  2. 02

    MPA contractor

    Quoting

    Live MPA quote for CPE. Steward reconciles allotment vs quote and flags extras that are residual-list vs local-fund.

  3. 03

    PSAP · Stripe

    Start pack

    $500 city-budget / private-pay. Diagnostic, 90-day portal, credit toward the engagement. Not leftover.

  4. 04

    PSAP Manager

    Item 4 request

    You send the pre-approval letter (we draft). Advisor reviews SOW, certs, NTE. Goal: a TD-288 consulting line during replacement.

  5. 05

    Finance / purchasing

    City file

    Professional-services PO or agreement. Implementation hours wait on that paper.

  6. 06

    Vendor PM

    Install

    Design, install, MAC quotes, acceptance test. Steward sits on the implementation call as owner-rep.

  7. 07

    PSAP chair + Steward

    Cutover

    Tabletop, fallback, 240-hour watch. Center still answers 9-1-1. Vendor still owns the switch.

  8. 08

    PSAP signs

    TD-284

    Acceptance. Steward starts the 90-day residual clock the same day.

  9. 09

    Steward + finance

    Day 0–90

    Consulting invoice plus other leftover quotes (GIS, furniture, chairs, headsets) that fit. Package to the Advisor.

  10. 10

    PSAP + AP

    TD-290

    City pays the Steward on reimbursement. TD-290 within 12 months. Cal OES is not your Accounts Payable for this line.

Who sits where

PSAP Manager / director

Signs Branch letters, city requisitions, TD-284, TD-290. Names Advisor, finance, vendor PM.

Does not: Run the vendor install.

City finance / AP

Vendor file, PO, pay invoices, proof of payment. P-card the Start pack if policy allows.

Does not: Interpret Chapter III.

Named Branch Advisor

Allotment, TD-288, residual pre-approval.

Does not: Be the project manager.

CA 9-1-1 Branch

SETNA policy and residual list.

Does not: Day-to-day vendor tasking.

CPE vendor PM

System design, install, acceptance test, 5-year maintenance.

Does not: Own the residual clock or renegotiate MPA for us.

Cycle Steward

PSAP-side cycle, quote hygiene, Friday brief, cutover watch, residual pack.

Does not: Sell CPE, configure the switch, or speak as the Branch.