Contracts & transitions · 2026–2030
Clarify CPE vs network, the new MPA, and whether to buy now
Written for the world after the new CPE contract starts — so PSAPs don’t treat 2020-era price sheets as current once RFP 26-16743 is active.
New CPE contract — RFP 26-16743
Statewide solicitation for 9-1-1 Call Processing Equipment establishing a new Master Purchase Agreement used by California PSAPs with SETNA funding as authorized by the CA 9-1-1 Branch.
- Solicitation
- RFP 26-16743 · CDT OSTP competitive negotiation (PCC §6611)
- Released
- April 27, 2026
- Est. award / execution
- August 7, 2026estimate
- Est. contract start
- August 14, 2026estimate
- Term
- 4 years base + two 3-year options (up to 10 years)
- Solution types
- Native cloud/data-center or on-premise — not both at one PSAP
- NG alignment
- NENA i3 + Cal OES ICD; CAMA→i3 conversion at migration at no additional cost to the State
- Install clock
- Ready for acceptance testing within 180 days of TD-288 (unless mutually revised)
- Maintenance
- 5 years included; years 6–7 year-to-year with approval (30-day cancel during extended years)
Ordering still follows Chapter III
CPE vs network — the one-pager PSAPs need
CPE — call handling
- What. System telecommunicators use to answer 9-1-1 (workstations, controllers, or cloud call handling).
- Contract. CPE Master Purchase Agreement (forward path: RFP 26-16743).
- Funding. CPE Fixed Allotment + residuals.
- Forms. Advanced Notification, allotment letter, TDe-285, TD-288, TD-284, TD-290.
- Cycle. ~5 years from TD-284 acceptance.
Network — call delivery
- What. How calls and NG data reach the PSAP (ESInet / NGCS / routing).
- Contract. Atos bridge (May 2026–2028) then long-term statewide NG (in procurement).
- Funding. Network services track — not CPE residual by default.
- Forms. Network orders / network-specific approvals.
- Cycle. Regional migration milestones — not CPE year-5.
Common mix-up
Transition timeline (2026–2030)
2026 · Contract transition
New CPE MPA awareness
Award/start window; stop treating old price sheets as current; high PSAP question volume; Advanced Notifications continue.
2026–2028 · Network bridge
Atos IP Flex bridge
NG delivery continues on the bridge while the long-term statewide NG9-1-1 contract is procured.
2027–2028 · Peak refresh + migration
Execute under the active MPA
Replacements, residual planning, joint CPE + network cutovers.
2028–2030 · Steady state
i3-capable norms
FOR findings, year 6–7 maint vs refresh decisions, ongoing FY budgeting.
Prior CPE MPA (historical only)
The prior statewide MPA remains useful context for projects already mid-stream (issued TD-288). It is not the primary buy path for new projects once the new agreement is active. Historical cost workbooks must not appear as “current max prices.”
What PSAPs should do this month
0 of 5 complete
Should I buy now or wait?
The highest-volume Advisor question, as a path instead of a lecture.
Interactive path
Step 1 — Eligibility
How long since your last TD-284 system acceptance?