Funding & allotments
How SETNA CPE money actually moves
Call-volume methodology stays (Chapter III). Dollar estimates must use the active MPA after RFP 26-16743 award. Official amounts always come from the Branch letter.
How allotments work
CPE Fixed Allotments fund a standard 9-1-1 call-handling system sized for approximately P.01 grade of service, using measured ECaTS call volume and standard system elements under the active CPE Master Purchase Agreement.
Busy-month
Level 2
0 – 800 calls / busy month
Busy-month
Level 3
801 – 1,200 / busy month
Busy-hour
Level 4
1,201 – 15,000 / busy month
Busy-hour
Level 5
> 15,000 / busy month
Level 1 is sunset. Levels 4–5 use busy-hour methods (with abandoned-call allowances per policy). Confirm the current Operations Manual for exact formulas and cloud multipliers.
Check your allotment
Planning tool vs official letter. Pre-filled with the sample PSAP you are viewing as.
Funding level
L5
busy-hour method
Typical positions
60–67
Planning band, not a funded count
Planning note
Not a funding commitment
- · Level 1 is sunset. Official dollars always come from the Branch Fixed Allotment letter.
- · Call-volume methodology is Chapter III. Dollar estimates must use the active MPA after RFP 26-16743 award — not 2020 workbooks.
- · Levels 4–5 use busy-hour methods (with abandoned-call allowances per policy). A busy-month figure only places you in the band.
- · MPA prices are maximums. Shopping multiple authorized contractors can improve value inside the same configuration.
Level 2
0 – 800 calls / busy month
Busy-month
Level 3
801 – 1,200 / busy month
Busy-month
Level 4
1,201 – 15,000 / busy month
Busy-hour
Level 5
> 15,000 / busy month
Busy-hour
CPE funding process (direct MPA path)
Analogy: allotment is a gift card. TD-288 is cashier approval. TD-284 is the delivery receipt.
00 →
Watchlist
Advisor / PSAP · Eligibility month known
01 →
Advance Notice
PSAP · Form received & logged
02 →
Allotment letter
Branch · Letter on file with $
03 →
Vendor selection
PSAP · Authorized contractor picked
04 →
SOW + quote review
Advisor · Advisor-clean package
05 →
Purchase package
PSAP + Advisor · Complete packet
06 →
TD-288
Branch · Signed commitment + TK#
07 →
Install
Vendor / PSAP · Ready for AT (≤180 days)
08 →
TD-284
PSAP · Acceptance date locked
09 →
Pay
Branch / fiscal · Invoice or TD-290 paid
10 →
Residual
PSAP · Clocks closed or zero
11
Closeout
Advisor · Red folder archived
Advanced Notification
Reservation, not boarding pass
Residual funds
Residual equals allotment minus final cost of the complete system replacement (or certified upgrade). Only items on the current Branch residual list, used in direct support of 9-1-1 call delivery, planned with the project.
Quotes / POs
Commonly within 90 days of TD-284 acceptance (confirm current policy).
Claims
Often within 12 months of acceptance for residual claims.
Hard nos
Approved-list browser
Illustrative Chapter III-style catalog. Always confirm the live Operations Manual list before you promise a purchase.
- yes
Additional funded-style workstations after primary CPE
Must match funded configuration rules.
- yes
9-1-1 call-taker headsets
Call-taking positions, not admin phones.
- yes
Dispatcher chairs
Quantity caps historically exist.
- maybe
9-1-1 call-taker furniture / consoles
Workstation vs storage rules. Need layout diagrams.
- yes
Mapping monitors
In the 9-1-1 work area.
- maybe
GIS services / software / equipment
Only when the residual path allows; GIS allotment is a different pot.
- maybe
Backroom power, cabling, interface, redundant networking in the center
Must directly support 9-1-1 traffic to the call taker.
- yes
9-1-1 logging recorder
For 9-1-1, not general admin recording.
- yes
Reader boards / pre-arrival instruction
Confirm current list membership.
- yes
PMP/ENP certified consulting for the CPE replacement
Tied to the replacement project.
- maybe
Temporary relocation of 9-1-1 positions
Project-tied; not a remodel budget.
- no
Break-room fridge / lobby TV / general office chairs
Vendor enthusiasm is not the list.
- no
Network circuits / ESInet / NGCS
Different contract and funding track.
- no
Training charged to CPE residual
ATA is a separate allotment.
- no
Staffing, overtime, facility lease
Local cost.
- no
MAC / relocation after install (unscoped)
Often PSAP-paid unless the SOW already funded it.
Request residual items
Reimbursement claims (TD-290)
Use when the PSAP paid the vendor and seeks SETNA reimbursement for pre-approved items. Attach TD-288, invoices, and proof of payment. Claim amount must not exceed the TD-288. Prefer direct funding (vendor → State) when Chapter III allows it.
Claim checklist5-year CPE cycle
Year 0
Install + TD-284
Warranty / package maintenance begins. Residual clocks start.
Years 1–4
Maintain
Covered under the project maintenance structure.
Year 5
Refresh eligibility
Advanced Notification window; full replacement or certified upgrade.
Years 6–7
Extended maintenance
May be Branch-approved year-to-year; new SOW aligns with up to two years continuation.
Year 8+
Local responsibility
Maintenance generally PSAP-funded unless Branch exception.