Skip to content
Cycle Steward · independent PSAP workspace
Cycle Steward Portal

Documents & resources

One library. Current first.

Forms, policy, guides, and contract materials. Open a record for version history. Prefer official Cal OES-hosted PDFs. Never publish confidential bidder cost cells.

Version control rule

Filter historical prior-contract items from the default view. Last-updated dates and change history sit on every record. Archive 2020 MPA price sheets stay archive.

21 records

  • currentPolicyv ADA-revisedUpdated Nov 1, 2024

    Chapter III — Funding (Operations Manual)

    Policy of record for SETNA CPE funding, residuals, reimbursement, and the Direct Funding Process.

    2 versions on file

  • currentPolicyv CurrentUpdated Jan 1, 2023

    Chapter VI — Fiscal and Operational Review

    FOR structure, what the Branch reviews, and how PSAPs should prepare.

    1 version on file

  • currentPolicyv CurrentUpdated Jan 1, 2023

    Operations Manual Glossary

    Official terms — prefer this over hallway slang when writing packages.

    1 version on file

  • currentFunding Formsv Current Branch formUpdated Jun 30, 2025

    Advanced Notification for CPE Funding (OES-PSC-299)

    Signals CPE funding need up to ~1 year before eligibility. Reservation, not a boarding pass.

    2 versions on file

  • currentFunding Formsv CurrentUpdated Jan 15, 2025

    TDe-285 CPE Allotment Spending Plan

    Plans how the fixed allotment (and residual) will be used. Required in the commitment package.

    1 version on file

  • currentFunding Formsv CurrentUpdated Mar 1, 2025

    TD-288 / PSC-288 Commitment to Fund

    Branch approval of amount and items. Direct-path spend is not authorized until this lands.

    2 versions on file

  • currentFunding Formsv CurrentUpdated Mar 1, 2025

    TD-284 / PSC-284 System Acceptance

    Locks the acceptance date. Starts payment and residual clocks.

    2 versions on file

  • currentFunding Formsv CurrentUpdated Apr 12, 2025

    TDe-290 / PSC-290 Reimbursement Claim

    Use when the PSAP paid the vendor for pre-approved items. Claim ≤ TD-288 and ≤ proof of payment.

    2 versions on file

  • currentFunding Formsv 3.2021Updated Mar 1, 2021

    STD-204 Payee Data Record

    Keep current so warrants can post. Incomplete payee data stalls reimbursement.

    1 version on file

  • currentFunding Formsv CurrentUpdated Aug 1, 2024

    TD-280 family — New PSAP / connectivity

    New PSAP stand-up, moves, and connectivity variants. Not a CPE residual form.

    1 version on file

  • currentFunding Formsv CurrentUpdated May 1, 2024

    GIS Spending Plan Guide

    GIS is a different pot from CPE residual. Do not co-mingle without a labeled plan.

    1 version on file

  • currentContractsv ReleasedUpdated Apr 27, 2026

    RFP 26-16743 — New CPE Master Purchase Agreement

    Statewide CPE MPA solicitation (CDT OSTP, PCC §6611). 4-year base + two 3-year options.

    2 versions on file

  • currentContractsv Bridge termUpdated May 1, 2026

    Atos Bridge Contract Fact Sheet

    NG9-1-1 network bridge (May 2026 – 2028) while the long-term statewide NG contract is in procurement.

    1 version on file

  • currentGuidesv PortalUpdated Jun 1, 2026

    Cloud vs On-Premise — one-pager

    Both allowed under the new SOW; you may not deploy both at one PSAP. Advisors stay brand-neutral.

    1 version on file

  • currentGuidesv PortalUpdated Jun 12, 2026

    NG9-1-1 Readiness Guide

    i3, CAMA conversion at migration, joint kickoff with network provider, facility demarc.

    1 version on file

  • currentGuidesv PortalUpdated Jun 1, 2026

    5-Year CPE Cycle Explained

    Acceptance → maintain → notice → refresh → years 6–7 → local. Residual clocks from TD-284.

    1 version on file

  • currentPolicyv Chapter III extractUpdated Nov 1, 2024

    CPE Funding Policy summary

    Direct funding via active MPA; invoices billed to the Branch; local procurement still applies to the PO.

    1 version on file

  • currentTrainingv Advisory BoardUpdated May 20, 2026

    Contract transition briefing — slides

    What ages out with the 2020 MPA, buy-now vs wait, and how ordering still follows Chapter III.

    1 version on file

  • currentGuidesv Advisor aidUpdated Mar 1, 2026

    FOR binder QC checklist

    Six-section binder: fiscal, network, CPE, performance, NG/cloud, references.

    1 version on file

  • currentLettersv PortalUpdated Feb 1, 2026

    Fixed Allotment letter — what it contains

    Ceiling context, next steps, and why an estimator is not a commitment.

    1 version on file

  • post-awardContractsv Pending awardUpdated Aug 7, 2026

    New CPE contract documents (when released)

    Authorized contractor list and public award materials — publish within 24h of Branch announcement.

    1 version on file