Training & education

Build PSAP capability so the next replacement is quieter

Short modules with a knowledge check. Marked complete on this device when you score at least two of three.

0 of 5 modules marked complete

12 minNot started

CPE funding basics

SETNA, Fixed Allotment, levels 2–5, Advanced Notification, TD-288/284, direct vs reimbursement.

Start module
10 minNot started

Residual funds

Leftover after a complete system, approved-list discipline, and the two clocks from TD-284.

Start module
10 minNot started

NG9-1-1 readiness

Three layers, two contracts, one cutover. i3 language and the Atos bridge.

Start module
8 minNot started

Contract transition 2026

RFP 26-16743, what ages out, buy now vs wait, mid-stream TD-288 hygiene.

Start module
8 minNot started

First 30 days in the chair

You just became the PSAP 9-1-1 contact. What to find, whom to call, what not to invent.

Start module

Glossary

Prefer Operations Manual language over hallway slang when writing packages.

ALI
Automatic Location Identification — location data delivered with a 9-1-1 call. GIS/ALI is a different pot from CPE residual unless the live list says otherwise.
ATA
Annual Training Allotment — a separate SETNA pot from CPE residual, with its own pre-approval and claim path.
Busy-hour
Measured peak-hour 9-1-1 volume used in Level 4–5 Fixed Allotment methodology (with abandoned-call allowances per policy).
Busy-month
Measured monthly 9-1-1 volume used to place a PSAP in levels 2–3, and as a band indicator for 4–5.
CAMA
Legacy analog call delivery used until a PSAP migrates to NG9-1-1 / i3.
CPE
Customer Premises Equipment — the call-handling system telecommunicators use (on-prem controllers/workstations or cloud call handling).
County Coordinator
County-level 9-1-1 role for MSAG, default routing, and neighboring-PSAP impact. Required on new PSAP stand-up.
Direct funding
Vendor invoices the CA 9-1-1 Branch. PSAP still issues the local PO, but does not front the SETNA-eligible cost.
ECaTS
Measured 9-1-1 call-volume source used in Fixed Allotment methodology.
ESInet
Emergency Services IP Network — the NG9-1-1 transport that delivers calls and data to the PSAP. Network track, not CPE residual.
Fixed Allotment
Branch-issued ceiling for a standard 9-1-1 call-handling system sized from measured volume under the active MPA. Official amount is the letter, not an estimator.
FOR
Fiscal & Operational Review — structured sit-down covering fiscal history, network, CPE, answer-time performance, and NG/cloud posture.
Host-remote
A smaller answering point hosted on another PSAP’s CPE. Still not a reason to raid someone else’s residual.
i3
NENA standard for NG9-1-1 call flow. New CPE SOW requires CAMA→i3 conversion at migration at no additional cost to the State.
ICD
Cal OES interface control document for NG9-1-1 interoperability. SOWs should cite required ICD/i3 language.
Lab-validated
Branch gate for authorized CPE contractors on the active MPA. Not the same as “we’ve used them before.”
MAC
Moves, Adds, Changes — post-install work. Often PSAP-paid unless already in the funded SOW.
MPA
Master Purchase Agreement — statewide CPE buying vehicle. Forward path is RFP 26-16743; 2020 MPA is historical for new buys.
MSAG
Master Street Address Guide — routing table the County Coordinator maintains. Wrong MSAG becomes wrong 9-1-1.
NGCS
Next Generation Core Services — routing, policy, and related NG functions. Network contract, not CPE allotment.
NG9-1-1
Next Generation 9-1-1 — IP-based call and data delivery. Separate funding and contracts from CPE.
P.01
Grade of service target used when sizing a standard funded system (about 1 in 100 calls delayed).
PSAP
Public Safety Answering Point — the 9-1-1 center.
Residual
Allotment minus complete funded system cost. Spendable only on the current approved list, in the 9-1-1 center, with clocks from TD-284.
RFP 26-16743
2026 solicitation for the new statewide CPE Master Purchase Agreement.
SETNA
State Emergency Telephone Number Account — the state 9-1-1 funding source.
SOW
Statement of Work — the contractor’s deliverable list. Must match the quote and MPA rules.
TD-280
Form family for new PSAP / plan / connectivity actions — not a CPE residual form.
TD-284
System Acceptance and Authorization. Locks the acceptance date; starts payment and residual clocks.
TD-288
Commitment to Fund. Branch approval with a tracking number. Direct-path spend is unauthorized before this.
TD-290
Reimbursement claim used when the PSAP paid the vendor for pre-approved items.
TDe-285
CPE Allotment Spending Plan — how the letter amount (and residual) will be used.
TK#
Tracking number from the TD-288. Must appear on invoices and claims.

Three-system model

1 · Network

Caller to PSAP. ESInet / NGCS / CAMA. Separate contracts and funding.

2 · CPE

Call handling the telecommunicator uses. Fixed Allotment + residual. This portal’s spine.

3 · Location

GIS / ALI / MSAG. Different pot from CPE residual unless the live list says otherwise.

Anonymized practices that work

  • Start Advanced Notification even if demos are still running — the letter SLA is longer than a vendor’s enthusiasm.
  • Joint kickoff with CPE vendor + network provider. Install day is too late for introductions.
  • The day TD-284 lands, create two calendar holds for residual clocks.
  • Ask finance for a SETNA recovery object before the first TD-290, not after the warrant hits the general fund.