Leftover / residual clock
Allotment letter minus complete system cost. Then the two clocks from TD-284. Not a funding commitment.
Letter minus complete system — not a vendor catalog
A380 · planning math
Enter complete system cost
Residual does not exist until the complete funded CPE system (or certified upgrade) has a cost. Do not shop the list on a blank quote.
Quote / PO clock (~90 days)
Feb 16, 2022
-1670 days from today
Invoice / claim clock (~12 months)
Nov 18, 2022
-1395 days from today
Approved-list browser
Illustrative Chapter III-style catalog. Always confirm the live Operations Manual list before you promise a purchase.
- yes
Additional funded-style workstations after primary CPE
Must match funded configuration rules.
- yes
9-1-1 call-taker headsets
Call-taking positions, not admin phones.
- yes
Dispatcher chairs
Quantity caps historically exist.
- maybe
9-1-1 call-taker furniture / consoles
Workstation vs storage rules. Need layout diagrams.
- yes
Mapping monitors
In the 9-1-1 work area.
- maybe
GIS services / software / equipment
Only when the residual path allows; GIS allotment is a different pot.
- maybe
Backroom power, cabling, interface, redundant networking in the center
Must directly support 9-1-1 traffic to the call taker.
- yes
9-1-1 logging recorder
For 9-1-1, not general admin recording.
- yes
Reader boards / pre-arrival instruction
Confirm current list membership.
- yes
PMP/ENP certified consulting for the CPE replacement
Tied to the replacement project.
- maybe
Temporary relocation of 9-1-1 positions
Project-tied; not a remodel budget.
- no
Break-room fridge / lobby TV / general office chairs
Vendor enthusiasm is not the list.
- no
Network circuits / ESInet / NGCS
Different contract and funding track.
- no
Training charged to CPE residual
ATA is a separate allotment.
- no
Staffing, overtime, facility lease
Local cost.
- no
MAC / relocation after install (unscoped)
Often PSAP-paid unless the SOW already funded it.